Clinical trial
Evaluation of the Safety and Effectiveness of the CereVasc® eShunt® System in Normal Pressure Hydrocephalus
NCT06498960 is registered in ClinicalTrials.gov with CereVasc Inc as lead sponsor.
Follow this trial by email Email me the PDF
Summary
Active, not recruiting, started November 2024. Interventional study, 230 participants (estimated). Lead sponsor CereVasc Inc; United States, Canada, Argentina. Primary measures: Primary Effectiveness Endpoint; Primary Safety Endpoint.
How it compares
25 similar trials: same condition (Hydrocephalus, Normal Pressure) and phase
Registry record
As filed in ClinicalTrials.gov.
- Title
- Evaluation of the Safety and Effectiveness of the CereVasc® eShunt® System in Normal Pressure Hydrocephalus
- Official title
- Pivotal Study to Evaluate the Safety and Effectiveness of the CereVasc® eShunt® System in the Treatment of Normal Pressure Hydrocephalus
- Lead sponsor
- CereVasc Inc
- Phase
- Not applicable
- Overall status
- Active, not recruiting
- Start date
- November 26, 2024
- Completion date
- July 31, 2031
- Enrollment
- 230 (estimated)
- Sites
- 32
Conditions
MeSH condition names; the registry's own terms follow.
Hydrocephalus, Normal Pressure
Registry terms: normal pressure hydrocephalus
Who could take part, where it ran, who ran it
As filed in ClinicalTrials.gov.
- Sex
- All
- Minimum age
- 60 Years
- Healthy volunteers
- No
- Study type
- Interventional
- Sites
- 32
- Countries
- United States, Canada, Argentina
- Lead sponsor
- CereVasc Inc
Arms
As registered; 2 arms.
| Arm | Type | Interventions |
|---|---|---|
| eShunt System | Experimental | CereVasc eShunt System |
Show registry wordingEndovascular placement of the eShunt Implant | ||
| VP Shunt | Active comparator | VP Shunt |
Show registry wordingSurgical ventriculo-peritoneal shunt procedure | ||
Primary endpoints
Registered primary outcome measures; 2 primary.
| Measure | Time frame |
|---|---|
| Primary Effectiveness Endpoint | 6 months |
Show registry wordingThe Primary Effectiveness Endpoint of this study is change in gait impairment at 6-months, compared to baseline. Change in gait impairment is defined as reduction in time required to complete the Timed Up and Go (TUG) test (stand up, walk 3m, turnaround, walk 3m, sit down). | |
| Primary Safety Endpoint | 6 months |
Show registry wordingAll adverse events will be reported for the investigational (eShunt System) and control (VP shunt) arms. Safety will be analyzed based on a review of all AEs in the investigational arm compared to the control arm, through 6-months post-procedure to demonstrate an acceptable safety profile of the eShunt System. | |
Lead sponsor's other trials
CereVasc Inc, most recent start first.
Similar trials
Same condition (Hydrocephalus, Normal Pressure) and phase, most recent start first.
+20 more trials See the condition page